Linking existing risk analysis to machine unit

Linking existing risk analysis to machine unit

Similar questions:  How to link an existing risk analysis to a machine unit? Where to add new machine to the existing risk analysis?

In order to link an existing risk analysis to a machine unit or location – they need to exist within the machine structure  . If the equipment unit is not within the structure, then it can be created as described in the article “How to create/edit machine unit”.

In the  module go to   tab and find the risk that needs to be linked to the machine unit. Use the search bar   or a filter button to facilitate the search. Open Risk details by clicking on its ID.

Within the Context section select the organizational unit under which the machine or location exist in the Machine Structure. Same risk analysis may be linked to multiple organizational units if necessary:


After that is done, the drop down list in the Machines field within this same Context section will show only those machine units that exist within selected organization units.


If the risk is linked to multiple machines – they can be selected in the drop down list and will appear in the Machines field within Risk analysis as well as in the relevant column within the risk list: