Similar questions: Where to mention potential
risk consequences? How to create or change consequences?
Go to module from the home page or using the
metro button menu. This opens the list of
existing risks.
Select the risk you’re wishing to indicate risk
consequences for and click on its ID to open (for example ). From there in the left side menu go
to Evaluation – Consequences tab. Select one or several possible
Consequences of the risk that’s being analyzed.
In case of multiple consequences selected, the
system will select the one with the highest value for the calculation of the
Risk Index. It is possible, nevertheless, to select manually a different one
from the list, even if its value is lower.
Selecting a different Consequence from the list for
calculation will automatically recalculate Initial and Residual Risk Index.
If the necessary consequence is not in the list, it
may be created by users having rights as per their role in the software to edit
risk analyses components. This is performed in within
- section of the menu.
To create a new Consequence, click on type the description and select
whether this potential consequence brings the risk to High severity potential
category (this may be used for prioritizing risks and mitigating measures for
them and will be displayed near the risk ID
)
The Severity value needs to be attributed from the
drop-down list to the Consequence so that it could be calculated within the
formula of initial and residual risk level (this list is being set up within
the Risk Matrix tab in the Settings menu).
Consequences in the list may be renamed or
deleted if they haven’t been linked
to any of risks that have been analyzed yet.
Before configuring the ADR module, it is preferable to perform the steps listed in the article Initial Setup. The platform contains all the essential elements for an organization to perform ADRs according to industry best practices. However, it is ...
Similar questions: How to view the risk history? Where to view which user did which actions during the risk analysis? In find the Risk in the list that you wish to view the history of and click on its ID to open details (for example) Click on link in ...
How to set up the risk matrix field? Similar questions: Where to arrange the risk matrix? In order to change or set up the risk matrix user needs relevant rights within his/her Role in the tenant of CONFORMiT software. Refer to your administrator ...
Similar questions: How to link a control measure to corrective measure? Where to indicate that corrective measure is already planned according to the risk analysis mitigation section? Links will be both visible within the Risk details mitigation ...
Similar questions: How to determine initial risk level? Where to select risk factors during risk evaluation? Risk factors names and description may vary from one organization to another as well as the formula for initial risk calculation may be ...