Suggestion to add the possibility in settings to add, if necessary, a section or a pop-up window with proof of CAPA closure. For example, they would be able to add pictures or scans of relevant reports, certificates, etc. If, for example, a required NDT testing of the metal structure was missing, then as a proof of closure it may be required to upload the scan of NDT testing report. We had such system in place, always proof of closure required, since management can be far away in another office, another part of the country or another country and they can’t come and verify on the spot whether the action was actually closed, or we just reported closed without doing anything. Management of our customers might like this idea, since it gives them more control over HSE conditions on their facilities.