Similar questions: How to create a new ECP (energy control procedure)?
Creating new lockout procedures can be done by users having relevant
right according to their role in the software. For those not having this right
button to create a lockout procedure will not be available. Please refer to
your CONFORMiT administrator if you need to obtain such right.
Go to module. This
opens the list of existing lockout procedures both draft and approved ones.
Click on to open the window, where it’s necessary to select the machine, for which
will be created this energy control procedure
Select the machine name that will be locked out, select whether it’s
complete or partial lockout and Identifier. Click on within this
window when finished.
This newly created procedure will appear in the list, from where it’s
necessary to open it by clicking on the Identifier (for example ).
In the Procedure details page go from one step to another Shutdown-Isolation-Return
to service and or one by one
to build the Procedure.
Select instructions from drop-down list or create additional ones where
necessary by clicking on
Similar questions: How to add a mechanism type to the list? Where to attach an image of the mechanism type that will be displayed on the Procedure? Creating or editing mechanism types is possible for those having rights of Administrator in their ...
Similar questions: How to create a copy of the lockout file? How to create similar LOTO procedures without having to re-create all steps each time? Similar pieces of equipment or parts of the same machine might have lockout Procedures that are very ...
Similar questions: How to add an instruction to the reference list in Lockout settings? How to modify an instruction in the reference list for lockout procedures in General Settings? Adding an instruction to the reference list in Settings for Lockout ...
Similar questions: How to quickly switch to device details to correct errors without closing the Procedure that is being built? Is there a quick link to access device details when creating the Lockout Procedure, without having to switch to Isolating ...
Similar questions: Which sequence to follow when reviewing articles during Lockout Onboarding Process? What is the order of actions to set up and start using the Lockout Module? 1. Initial CONFORMiT Setup When implementing CONFORMiT, several ...